Product Details
spirally welded steel pipe C welding procedure qualification shall be carried out by the team participating in the construction of the project. The welders participating in the qualification shall be selected from the welders of the project team and the welders with this level shall have at least one crew member.In fact, another purpose of welding process assessment is to check whether the construction team can master the corresponding welding skills, so as to ensure the overall welding quality of the whole construction team.
Brief Introduction
spirally welded steel pipe
CHS(Circle hollow section) | |
Technique: | Spiral Weld (SSAW) |
Usage: | Oil pipeGas pipeSteam pipeUnderground pipe Pipe pile |
Specifications: | OD 219-2020mmWT 7.0-12.0mm Length: 6-12m |
Standard: | API 5L, ASTM A53, ASTM A252, ASTM A795, ISO65GB-T 9711-2011SYT 5037-2012 |
Material: | GRA, GRB/Q195, Q235, Q34510#, 20# |
Pipe Ends: | plain endsbeveled ends |
Packing: | piece by piece. small sizes nested into big sizes. |
Payment terms: | T/T or L/C |
Delivery time: | 15-45 days (based on quantity) after receiving advanced payment by T/T or LC . |
Main market: | Southeast Asia, South Asia, Middle East, Europe, Middle&South Americ, Africa and Oceania |
welding procedure qualification shall be carried out by the team participating in the construction of the project. The welders participating in the qualification shall be selected from the welders of the project team and the welders with this level shall have at least one crew member.In fact, another purpose of welding process assessment is to check whether the construction team can master the corresponding welding skills, so as to ensure the overall welding quality of the whole construction team.
most importantly, the project must have standards for welding quality control and acceptance methods.The welding standards of domestic long-distance pipelines are generally modified in accordance with API 1104 standards of American petroleum institute. The purpose of the improvement is to make the adopted methods and indicators meet the requirements of engineering construction and use conditions.
The Process Flow
The Workshop
Edit by Ms. Vicky of CSPG
Contact us directly by:
Email: ella@cnspipe.com ,vicky@cnspipe.net
Tel / Whatsapp: +86-180327140146
Skype: cnspipe002