What Will 2018 Sulfur Cuts Mean For The Heating Oil Markets?

- Apr 20, 2019-

More demand for lower sulfur heating oil will shape the markets as the last states in the northeast turn to 15ppm heating oil. Even after two mild winters, demand is strong and the markets are shifting. Never before have these markets been so important.

Find out how to track these changes using Argus Laurel and Buckeye pipeline assessments at our upcoming webinar. 

 

Product Name
Seamless Steel Tubes For Gas Cylinder
Material Grade

  37Mn 34Mn2V 30CrMo 35CrMo 34CrMo4 30CrMnSiA

  STH11 STH12 STH21 STH22 38Mn6 30CrMo4

Standard
GB18248 JIS G3429 EN 10297 ASTM A372 ISO11120
Outer Diameter/mm
  48-711
Wall Thickness/mm
3-40
Length/m
4-12
  Technique
Cold Drawn, Cold Rolled,  Hot rolled
Application
  Gas Cylinder

 

 

 

Certifications

ASTM A372 Seamless Steel Pipes For Gas Cylinder 

Company Information

Cangzhou Steel Pipe Group (CSPG) Co., Ltd. is a large-sized, key metallurgic enterprise of Hebei Province in North China, whose history dates back to 1994. CSPG currently em/paces six member companies with products varying from SSAW, LSAW, ERW, seamless steel pipes to 3PE pipes, galvanized pipes, casing pipes, etc. A Joint-stock corporation, CSPG occupies an area of 600,000 square meters with a total asset of $530 million.We have 3 advantages in Seamless Steel Pipes:


1.Better Price
2.Ever Shorter Lead Time
3.Ever Less MOQ
 
Today, our products are sold Central Asia, Russia, Mexico, southeast Asia and other countries.
High quality products and intimate service is our biggest highlight.
Welcome to purchase our products, we sincerely hope to serve you.
 
 ASTM A372 Seamless Steel Pipes For Gas Cylinder 
Customers' Photos

ASTM A372 Seamless Steel Pipes For Gas Cylinder 

FAQ

1.How are we able to request samples?
The samples are free however freight ought to be collected. Please ship sample listing and courier account number via email.

2.MOQ?
For trial order,you may order even 1pc or 2pcs to check our quality. From future orders, MOQ is 20 tons.

3.Delivery time?
Stock pipe: in 7~10 days.No inventory pipes: relying on the quantity in 30 days.

4.Payment terms?
One is 30% posit by means of TT earlier than production and 70% lance in opposition to copy of B/L; the alternative is Irrevocable L/C 100% at sight.

5.Surface coating?
Anti-rusted painting, varnish painting, galvanized, 3LPE, 3PP,Zinc oxide yellow primer,Zinc phosphate primer and as in keeping with customers'
request.

6.Packing?
In bundles or in loose, plastic pipe cap or pipe cease protector, woven bags or as per customers' request.


7.Shipment terms?
Container vessel, bulk cargo ship, train, land transportation.