Valin Steel: To Deal With Pressure Caused By Higher Iron Ore Prices From Threeaspects

- Jul 20, 2019-

Valin Steel: to deal with pressure caused by higher iron ore prices from threeaspects


Valin Steel announced recently that it will deal with the great pressure of production costs caused by higher iron ore prices from three aspects. Firstly. it will forecast iron.ore prices based on the supply in the market and the demand from steel mills in order to purchase the material at suitable prices Secondly it will adiust the specification proportion for iron ore it uses to reduce purchasing costs. Thirdly, it will continue to keep limited raw material stocks so as to reduce funds used in purchasing



 

 

Cangzhou Steel Pipe Group (CSPG) Co., Ltd. is a large-sized, key metallurgic enterprise of Hebei Province in North China, whose history dates back to 1994. CSPG currently em/paces six member companies with products varying from SSAW, LSAW, ERW, seamless steel pipes to 3PE pipes, galvanized pipes, casing pipes, etc. A Joint-stock corporation, CSPG occupies an area of 600,000 square meters with a total asset of $530 million.



Specialized in the production of straight welded pipe spiral pipe galvanized pipe 3PE/3PP/FBE/TPEP internal and external epoxy powder internal and external epoxy resin cement mortar two cloth three oil buried pipeline IPN8710 non-toxic drinking water internal and external plastic coated lining plastic and other anti-corrosion pipe fittings for oil and gas pipeline water conservancy projects



Executive standard :DIN30670 DIN30678 CSA Z245 AFNOR nf49-710/711 NACE rp0394/0490 AWWAC 210/C213GB/T9711 API 5L ISO 3183Material: Q235B/Q355BGR A GR B x42-x80 l245-l555

 

Business scope: 21.3mm-3620mmLSAW submerged arc welded pipe 325-2020mmERW straight welded pipe 6mm-711mmSMLS seamless tube 10-1120mmSSAW spiral steel tube 219-3620mmDemand for quality suppliers and partners