US Steel Eyeing Restart Of Gary No.4 Blast Furnace In December

- Nov 21, 2020-

202011231154529918181.webp.webpU.S. Steel is said to be eyeing restart of the No. 4 blast furnace at its Gary Works in Indiana in December amid tiohtenino availability in the lJS market accordino to market sources.The No. 4 furnace at Gary, one of the four total furnaces at the site, temporarily suspended operation in early 2020 for planned maintenance and has remained out of production as the company adjusted its production earlier in the vear due to the covD-19 pandemic us Steel restarted onerations at the No 6 and No 8 blast furnaces at Gary in July and Auqust respectively.Multiple buy-side sources reported hearing that the furnace would be restarted in the first week of December.During the company's third auarter conference call in late October. US Steel CFO Christie Breves said the company is looking to spend about S80 million on hot-strip mill capability upgrades at the Gary Works facilityin coniunction with planned outages in 2021The No.4 furnace at Gary has an annual capacity of 1.36 million st according to data from the Association for Iron and Steel Technology.


Product Description

large diameter spiral welded carbon steel pipe
Technique:
Spiral Weld (SSAW)
Usage: 
Oil pipe         Gas pipe           Steam pipe            Underground pipe             Pipe pile
Specifications:
OD 219-2200mm
WT 6.5-20.0mm
Length: 6-12m

Standard:
API 5L, ASTM A53, ASTM A252
GB-T 9711-2011
SYT 5037-2012
Material:
GRA, GRB  /  Q195, Q235, Q355  10#, 20#
Pipe Ends:
plain ends;    beveled ends
Packing: 
piece by piece.
small sizes nested into big sizes.
Payment terms: 
T/T or L/C
Delivery time: 
15-45 days (based on quantity) after receiving advanced payment by T/T or LC .
Main market:
Southeast Asia, South Asia, Middle East, Europe, Middle&South Americ, Africa and Oceania
Detailed Images

Galvanized


Bare


3PE


HTB1fKM8OVXXXXX4XXXXq6xXFXXXQ_.webp.jpg
HTB1y_AWOVXXXXbRXpXXq6xXFXXXO_.webp.jpg

Strict Quality Inspection:

1) 1 Tianjin government accredited business technology center 2) 3 National accredited laboratory with CNAS certificates 3) During and after production, 4 QC staffs with more than 5 years experience inspect products in random. 4) Acceptable inspection from third party appointed/paid by buyer, such as SGS, BV. 5) Approved by Malaysia, Indonesia, Singapore, Philippines, Australia, Peru and UK.

Cangzhou Steel Pipe Group (CSPG)Co.,Ltd.

No.92 JieFang East Road ,Cangzhou City, Hebei,P.R.China.

CSPG  has more than eighteen years history company which located in Lecong Iron and Steel World, a well-known steel distribution center in China, with superior geographical position and convenient water and land transportation. 


We are a direct-selling manufacturer specializing in the research and development of spiral steel pipes, steel spiral pipes, anti-corrosion steel pipes inside and outside. Since its inception, the company has been guided by a brand-new thinking of steel pipe product market based on the business philosophy of honesty, pragmatism and knowledge-seeking.
Packing & Delivery
202011231154523459691.webp.webp
202011231154529918181.webp.webp
202011231154522674844.webp.webp
202011231154525904089.webp.webp
Our Service

Before-sale service:

Welcome to visit our factories. 


After-sale service:

Quality/Quantity Claims: The Buyer is entitled to make both quality and quantity claim in writing against the Seller within 90 days after arrival at the port of destination. All claims must be supported by survey reports of recognized first class surveyors within the above mentioned stipulated time frame. 


Our Company



Who We are?

(1) China Top 500 Enterprises Industry Leading Brands
(2) 17 years experience in manufacturing and exporting steel products since 2000.
(3) 12 Consecutive Years of The First Production and Sales-- 
Over 1380,0000 Tons sales and production
(4) Key Project Supplier---The Capital International Airport, Shanghai Pudong International Airport, the 2008 Olympic Games venues , the Word Expo 2010, etc.


What We own?
8000 employees.

62 ERW steel pipe production lines 40 hot dipped galvanized steel pipe production lines 31 square and rectangular steel pipe production lines 9 SSAW steel pipe production lines 25 steel-plastic complex steel pipe production lines 12 hot dip galvanized square and rectangular steel pipe production lines 3 national accredited laboratory with CNAS Certificates 1 Tianjin government accreditd business technology center





Production line:

202011231154528632568.webp.webp

Product application and Demonstration projects:

Exhibitions and booths:

Large amount of stocks:

202011231154524902556.webp.webp

1. ERW Steel Pipe

Size: OD 1/2"-20"
Thickness: 1.5mm-18mm
Length:6m

202011231154528131801.webp.webp

2.ERW Hot-dipped Galvanized Steel Pipe

Size: OD 1/2"-20"
Thickness: 1.5mm-18mm
Length:6m
Zine Coating : 30-40μm

202011231154522361046.webp.webp

3. Square /Rectangular Steel Pipe 
Rectangular Steel Pipe 

Square size: 20*20mm-500-500mm

Rectangular size: 20*40mm-300*500mm

Thickness: 1.5mm-12mm
Length:6m/12m

202011231154529103617.webp.webp

4. SSAW Steel Pipe

Size: OD 8"-80"
Thickness: 5mm-35mm
Length:6m/12m

Related Products
202011231154525089524.webp.webp

LSAW Steel Pipe

OD 325-2020 MM

WT 7-80 MM

L 6-12 M

Seamless Steel Pipe

OD 13.7-610 MM
WT STD / SHC40 / SCH80 / SCH160
L 6-12 M

202011231154526846187.webp.webp
202011231154528602850.webp.webp

Anneal steel pipe / Full black steel pipe / Bright steel pipe / MS steel pipe

Round Size: 10-100 MM

Square Size: 10*10-75-75 MM

Rectangular Size: 6*10-50*100 MM

Oval steel pipe

Size: 9.5*17-10*30 MM

Pre-galvanized steel pipe

Round Size: 20-100 MM
Square Size: 20*20-100*100 MM
Rectangular Size: 20*40-50*100 MM
WT 0.8-2.0 MM
L 5.8-6 M

202011231154522832095.webp.webp
FAQ


1.Q:Where is your factory located? How can I visit there?
We locate in Tianjin, China, 30 minutes from Beijing by train.

2.Q:Can I get some samples?
Yes,free samples can be provided

3.Q:What do your factory do regarding quality control?
From material to produts, we inspect each process to keep good quality.
And BV/SGS inspection can be accepted.

4.Q:How about MOQ ?
We have stock of common sizes at hand, so one ton is accepted.

5.Q: How long does your warranty?
We can assured the quality within 90 days after receiving the cargoes.

6.Q: How to contact with you ?

Title goes here.

Semi-Automatic PET Bottle Blowing Machine Bottle Making Machine Bottle Moulding Machine PET Bottle Making Machine is suitable for producing PET plastic containers and bottles in all shap