Unions Call Strike At ArcelorMittal's Llva Plant Over Job Cut Plan

- Jun 09, 2020-

Unions representing workers at the llva steel plant in southern Italy called a strike for Tuesday to protest at reported plans by ArcelorMittal for thousands of job cuts at the struggling facility.The call by the FIM. FIOM and UILM unions came after Industry Minister Stefano Patuanelli accused the group of failing to respect the terms of a rescue agreement signed with the governnent in March. Under that agreement, ArcelorMittal agreed to suspend plans to walk away from the plant in the southern city of Taranto.which it acquired in 2018, in exchange for a significant injection of state funding.It was reported that a new industrial plan presented to the government late last Friday included 5.000 job cuts A snokeswoman for ArcelorMittal confimed the oroun had presented a plan but declined to provide details.Patuanelli said last Saturday that an industrial plan presented by the group was not in line with the March agreement and that ArcelorMittal appeared to be using the COVID-19 emergency as an excuse for not sticking to the acreement.The unions said the plan was unacceptable and demanded full employment, investment and environmental restructuring in line with an agreement from 2018. Unions are expected to meet Patuanelli n Tuesday to discuss the situation.


Product Description

Title goes here.

 Natural Gas Transportation Spiral Seam Steel Helical Welded SSAW Pipe With High Quality .

Product Name
 SSAW Pipe With High Quality 
Material
16Mn,10#,20#,Q235,Q345
Color
Silver
Standard
BS EN10217,API 5L,ASTM A53-2007,ASTM A252-1998,GB/T 9711.1-1997,
GB/T 9711.2-1999,GB/T3901
Outer Diameter (OD)
219mm - 3600mm
Wall Thickness (WT)
5mm - 26mm
Package
In bundles, Painting, Beveled edges, plastic caps ends, or as buyer's request.
Used
The pipes are widely used in natural gas, offshore oil piling, petroleum, chemical industry, electric power, heat, water supply adn drainage, steam heating, pressure steel pipe for hydropower stations, thermal power generation, water adn other long-distance transmission pipelines and piling, Bridges, steel structures and other engineering fields.
Products Show
HTB1UvlHOZfpK1RjSZFO7616nFXaG.png_.webp
HTB1ZPtBOVzqK1RjSZFvq6AB7VXaJ_.webp.jpg
Workshop
Process
Our Certifications
Customer Photo
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: 30% T/T in advance ,balance before shippment, or L/C at sight balance of copy of B/L