TURKEY STEEL PIPE EXPORTS: Prices Up Again On Rising Material Costs, Firm Demand

- Jan 18, 2021-

Turkish steel pipe export prices have continued to increase on rising raw material costs, sources said on Wednesday January 13.

monthly price assessment for steel structural pipe, export, S235JR grade, EN10219, 2mm wall thickness, fob main port Turkey, was $820-830 per tonne on Wednesday, up from $730 per tonne on December 9.

The Turkish pipemills were offering the material at $820-830 per tonne fob, with deals...


Specifications List
SpecificationOD21.3mm-406.4mm
WT1.2-20mm
Length1-12m
TechniqueHot Rolled/Cold Drawn
Steel gradesQ195, Q235A-B, Q345A-E, 20#, 10#,16Mn, ASTM A36,ASTM A500,
ASTM A53, ASTM 106, SS400, St37, St52, S235JR, S355TRH ect.
StandardsGB/T 3091-2001,GB/T13912-2002, BS 1387, ASTM F1083 ect.
Pipe endsplain, beveled, threaded, socket with holes, with PVC clap/ coupling/ clamp,
or as customers' requirement
treatment
Applicationliquid delivery (pump well, gas, water), construction pipe, structural
pipe(greenhouse structure, fence post), curtain wall, machinery part ect.


Packagein bundle, no other package or wrapped with waterproof,
or as customers' requirement
Delivery Time10days from stock; 15-20days produced according to the qty
Payment TermT/T or L/C
Price TermCIF; CFR; FOB
Loading PortXingang China
Others1.All the pipes is high-frequency welded.
2.Both inner and outer welded stab can be removed.
3.Special design available according to requirement.
4.Pipe can be necked down and punched holes.
5.Supplying BV or SGS Inspection if client need.

FAQ

Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need new special and rare materials,usually need 15-20 days to make shipment.

Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.

Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.

Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.

Q6. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS.