On April 16, 2019, the us Commerce Department announced on imports from China of 12-16.5 inches in diameter steel wheel (SteelWheels12-16.5 InchesinDiameter) to make a preliminary anti-dumping: forced responses to an initial determination enterprise ChangzhouChungangMachineryCo., ltd. is 38.27%, the margin of dumping of Chinese common dumping margin of 44.35%.A final ruling is expected on July 2, 2019.The case involves products under U.S. harmonized tariff code 8716.90.5035 and some products under 8716.90.5059.In the anti-dumping investigation, the us department of commerce ruled that all Chinese enterprises involved in the case were in an emergency situation of exporting a large number of products involved in the case in order to avoid possible positive preliminary finding.It is therefore decided that the provisional anti-dumping measures in this case will be retroactive to the Chinese products declared at the us customs 90 days prior to the publication of the preliminary finding in the federal register.On August 29, 2018, the United States AmericanaDevelopment, Inc., a subordinate enterprise DexstarWheel in application on August 8, 2018, the us Commerce Department announced on imports from China of 12-16.5 inches in diameter steel wheel to launch anti-subsidy and anti-dumping investigation.On September 21, 2018, the U.S. international trade commission (USITC) voted to impose a preliminary anti-dumping and countervailing duty finding on imports of steel wheels from China with diameters ranging from 12 to 16.5 inches.
FAQ
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need new special and rare materials,usually need 15-20 days to make shipment.
Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.
Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.
Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.
Q6. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS.
Cangzhou Steel Pipe Group (CSPG) Co., Ltd. is a large-sized, key metallurgic enterprise of Hebei Province in North China, whose history dates back to 1994. CSPG currently em/paces six member companies with products varying from SSAW, LSAW, ERW, seamless steel pipes to 3PE pipes, galvanized pipes, casing pipes, etc. A Joint-stock corporation, CSPG occupies an area of 600,000 square meters with a total asset of $530 million.
Specialized in the production of straight welded pipe spiral pipe galvanized pipe 3PE/3PP/FBE/TPEP internal and external epoxy powder internal and external epoxy resin cement mortar two cloth three oil buried pipeline IPN8710 non-toxic drinking water internal and external plastic coated lining plastic and other anti-corrosion pipe fittings for oil and gas pipeline water conservancy projects
Executive standard :DIN30670 DIN30678 CSA Z245 AFNOR nf49-710/711 NACE rp0394/0490 AWWAC 210/C213GB/T9711 API 5L ISO 3183Material: Q235B/Q355BGR A GR B x42-x80 l245-l555
Business scope: 21.3mm-3620mmLSAW submerged arc welded pipe 325-2020mmERW straight welded pipe 6mm-711mmSMLS seamless tube 10-1120mmSSAW spiral steel tube 219-3620mmDemand for quality suppliers and partners