Russia Extends Non-working Period Until May 11

- Apr 30, 2020-

Russian President Vladimir Putin on April 28 announced that the national non-working period will be extendedl until May 11Putin ordered the government to prenare by Mav 5 a plan for the gradual liffino of restrictions related tovernnCovID-19 from May 12 He said these recommendations would take into account the outbreak situation in.order to provide criteria or index for lifting restrictions. and federal agencies would have a week to prepare.with some recions continuina to impose or even tiohten restrictions while others could phase out quarantine and resume work.He also ordered the government to prepare a package of measures to support the economy and the livelihood of Russian citizens.


Specifications List
Specification
OD
21.3mm-406.4mm
WT
1.2-20mm
Length
1-12m
Technique
Hot Rolled/Cold Drawn
Steel grades
Q195, Q235A-B, Q345A-E, 20#, 10#,16Mn, ASTM A36,ASTM A500,
ASTM A53, ASTM 106, SS400, St37, St52, S235JR, S355TRH ect.
Standards
GB/T 3091-2001,GB/T13912-2002, BS 1387, ASTM F1083 ect.
Pipe ends
plain, beveled, threaded, socket with holes, with PVC clap/ coupling/ clamp,
or as customers' requirement
treatment
Application
liquid delivery (pump well, gas, water), construction pipe, structural
pipe(greenhouse structure, fence post), curtain wall, machinery part ect.

Package
in bundle, no other package or wrapped with waterproof,
or as customers' requirement
Delivery Time
10days from stock; 15-20days produced according to the qty
Payment Term
T/T or L/C
Price Term
CIF; CFR; FOB
Loading Port
Xingang China
Others
1.All the pipes is high-frequency welded.
2.Both inner and outer welded stab can be removed.
3.Special design available according to requirement.
4.Pipe can be necked down and punched holes.
5.Supplying BV or SGS Inspection if client need.
Our Network

Cangzhou Steel Pipe Group (CSPG)Co.,Ltd.

No.92 JieFang East Road ,Cangzhou City, Hebei,P.R.China.

CSPG  has more than eighteen years history company which located in Lecong Iron and Steel World, a well-known steel distribution center in China, with superior geographical position and convenient water and land transportation. 


We are a direct-selling manufacturer specializing in the research and development of spiral steel pipes, steel spiral pipes, anti-corrosion steel pipes inside and outside. Since its inception, the company has been guided by a brand-new thinking of steel pipe product market based on the business philosophy of honesty, pragmatism and knowledge-seeking.

FAQ

Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need new special and rare materials,usually need 15-20 days to make shipment.

Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.

Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.

Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.

Q6. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS.