POSCO Restarts 3rd Blast Furnace

- Jul 17, 2020-

POSCO restarts 3rd blast furnace


South Korean steelmaker POSCO said last Fridav it has restarted its third blast furnace amid the global recession soarked by the covID-19 pandemic.The move came 20 months after repair and maintenance work worth abaut 400 billion won (USS332.6 million) at the third blast furnace in Gwangyang, about 420 kilometers southwest of Seoul.The repair work raised the annual production of crude steel at the third blast furnace by 25 percent to 4 6 million tons. accordina to the companvThe resumption, which had been pushed back twice. in Mav and June, came as demand from automakers. construction comnanies and shipbuilders declined due to the covlD-19 pandemic.POSCO has five blast furnaces in Gwangvang and four blast furnaces in Pohang.about 375 kilometers southeast of Seoul.    


Product Description
Brand:
Wugang mill, Shougang mill, Angang mill, Jigang mill, Baosteel etc.
Certification:
ISO, SGS, BV, CE or as required
Thickness:
1mm-56mm
Outer diameter:
6mm-820mm
Length:
3000mm, 6000mm, 8000mm, 12000mm or as required.
Surface:
Commonly mill finished surface
Standard:
ASTM,JIS,EN,DIN,BS,GB,etc
Delivery time:
3 days after confirming the order
MOQ:
 1 ton or 1 pc
Payment term:
L/C at sight or 30% TT as deposit and the balance paid against copy of B/L
Applications:
Construction, building, outside wall, railway, containers etc.
Advantages
Showing the splendor of your quality, wearresistant as well, strong corrosion resistance and decorative effect
Detailed Images
Item
Material
Standard
Specification(OD*WT)mm
Alloy pipe
Cr5Mo.15CrMo,13CrMo44,12Cr1MoV P22 T91,P91,P9,T9 Wb36
GB5310-95 GB9948-88
ASTMA335/A335M
ASTMA213/213M
DIN17175-79
JISG3467-88
JISG3458-88
16-824*2-100
High-pressure boiler pipe
20G,A106,ST 45
GB5310-95
ASTM A 106-99
DIN17175-79
14-630*2-80
Seamless pipes for petroleum
20,12 CrMo,15 CrMo
GB9948-88
10-530*1.5-36
High-pressure Seamless pipes for fertilizer making equipment
20,16Mn,Q345
GB6479-2000
18-530*3-40
Low and mediun pressure boiled pipe
10,20
GB3087-1999
10-530*2-40
Fluid pipe
20, Q345
GB/T8163-1999
8-630*1.0-40
Structural pipe
10,20,35,45, 16Mn,Q345B
GB/T8162-1999
6-1020*1.5-100
Line pipe
Gr..B
API
60-630*1.5-40
Hydraulic prop pipe
27SiMn
GB/T17396-1998
70-377*9-40
Packing & Delivery

the sanitarysystem usually
1.poslish both inside and outside
2.on the both side of pipes closing with plastic cap
3.each pipe use a plastic bag protect the pipe
4.the outside packing use wooden case to protect the produce


202012041343055944097.webp.webp
Certifications
Our Company
202012041343055159250.webp.webp