Nigeria Spends As High As USD3.3 Billion On Finished Steel Imports

- Sep 06, 2020-

Arc. Olamilekan Adegbite, the Minister of Mines and Steel Development (MMSD), announced on 31 August that Nigeria spends about USD3.3 billion on finished steel imports.Adeabite pointed out that Nigeria's GDP is about USD440 billion, and it is one of the fastest growing economies in Africa. Although there are more than 30 steel manufacturers in Nigeria, none of them is capable of smelting steel. The main raw materials are steel scrap and billet imported from China, and the annual production capacity is only 2.2 million tons.


Detailed Information
Production Range:
Round Steel Pipe (17mm-406.4mm)
Square Steel Pipe (20mm*20mm-500mm*500mm)
Rectangular Steel Pipe (20mm*30mm-400mm*600mm)

Specification
OD
17mm-406.4mm
WT
0.8-20mm
Length
1-12m
Zinc coat
200-600g/m²
20-83μm
0.13-2oz/ft²
Technique
Pre-galvanized / Hot-dipped galvanized / Hang-planting galvanization
Steel grades
Q195, Q235A-B, Q345A-E, 20#, 10#,16Mn, ASTM A36,ASTM A500, ASTM A53, ASTM 106, SS400, St37, St52, S235JR, S355TRH ect.
Standards
GB/T 3091-2001,GB/T13912-2002, BS 1387, ASTM F1083 ect.
Pipe ends
plain, beveled, threaded, socket with holes, with PVC clap/ coupling/ clamp
Treatment
or as customers' requirement
Delivery Time
10days from stock; 15-25days produced according to the qty
Price Term
CIF, CFR, EXW
Loading Port
Shanghai, China/ Tianjin, China
Others
1.All the pipes is high-frequency welded.
2.Both inner and outer welded stab can be removed.
3.Special design available according to requirement.
4.Pipe can be necked down and punched holes.
5.Supplying BV or SGS Inspection if client need.


Our Company
We are one of the Professional manufacturers Exporter Pipeline products in China .
Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000 square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings, flanges and related accessories. Now, it owns a number of advanced pipe production equipments, metal, forging, machining, cold forming, hot extrusion, such as heat treatment process, producing 60, 000 tons of pipe fittings. Company with a variety of detection devices, such as nondestructive testing, chemical analysis, metallographic examination, physical experiments. The technical is very strength, our main products contain fittingsforged socket welding fittings and threaded fittings, pipe weld and the materials of the products contain stainless steel ,duplex-stainless steel alloy steel.

Cangzhou Steel Pipe Group (CSPG)Co.,Ltd.

No.92 JieFang East Road ,Cangzhou City, Hebei,P.R.China.

CSPG  has more than eighteen years history company which located in Lecong Iron and Steel World, a well-known steel distribution center in China, with superior geographical position and convenient water and land transportation. 


We are a direct-selling manufacturer specializing in the research and development of spiral steel pipes, steel spiral pipes, anti-corrosion steel pipes inside and outside. Since its inception, the company has been guided by a brand-new thinking of steel pipe product market based on the business philosophy of honesty, pragmatism and knowledge-seeking.

Recommend Products
Recommended by seller

Ribbon Iron Width 5mm Flat Carbon Steel Bar Flat- Rolled Steel Aluminium Flat Bar Copper Steel

$1.00 - $25.00 / Piece

10 Pieces

Square Rod 3*3 4*4 5*5 Solid Steel Twisted Bar Aluminium Square Bar 6061 Profile Steel

$1.00 - $4.25 / Piece

10 Pieces

Tee Tube Y Type DN25 Copper Nickel 45 Degree Y Branch Pipe Fitting Lateral Tee Threaded Fittings ANSI ASME

$72.22 - $79.00 / Piece

1 Piece

Stainless steel threadolet reducing ASTM A182 316L 2"*3" class 3000 ASME SS Pipe fittings

$17.15 - $18.15 / Piece

100 Pieces

FAQ
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.

Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.

Q 5. what kind of certificates you have?
A1: We have been ISO9001:2008 and ISO14001:2004 certified by SGS since 2005.
A2: We have various rubber compounds approved by UL, FDA, NSF, KTW, W270, WRAS, ACS, AS4020, EN681, EN549, ROHS and REACH.