NDRC Prolongs Policy For Temporarily Lowering Power Cost Of Enterprises

- Jun 27, 2020-

On 24 June. National Develooment and Reform Commission (NDRC) release the notice about prolonaina the policy for temporarily lowering power cost of enterorises.Accordina to the notice, the policy continue targeting power consumers that carry out general industrial and commercial electricity rate, other rates and qreat industry rate, except consumers from high energyconsumption industries. From 1 July to 31 December, 2020. power grid enterprises will continue calculating electricity bills for abovementioned power consumers. including those participating in market transactions. on the basis of 95% of the original rates.


Product Description
Product Name
Carbon Steel Pipe 
Wall Thickness
0.5--30mm
Standard
ASTM A53, BS1387,ASTM A106,GB/T3091
End Finish
Plain End,Beveled End,Plastic Pipe Cap
Packing
Bundle, or with all kinds of colors PVC or as your requirements
Length
1--12m
Payment Terms
1).T/T: 30% advanced payment, balance payment against the copy of B/L
2).100% LC at sight
Key Word
By seller or By buyer or By third party
Inspection
By seller or By buyer or By third party
Details Images
Certifications
Company Profile
Why Choose Us

Cangzhou Steel Pipe Group (CSPG)Co.,Ltd.

No.92 JieFang East Road ,Cangzhou City, Hebei,P.R.China.

CSPG  has more than eighteen years history company which located in Lecong Iron and Steel World, a well-known steel distribution center in China, with superior geographical position and convenient water and land transportation. 


We are a direct-selling manufacturer specializing in the research and development of spiral steel pipes, steel spiral pipes, anti-corrosion steel pipes inside and outside. Since its inception, the company has been guided by a brand-new thinking of steel pipe product market based on the business philosophy of honesty, pragmatism and knowledge-seeking.

FAQ
                                                                FAQ

Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.

Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.

Q 5. what kind of certificates you have?
A1: We have been ISO9001:2008 and ISO14001:2004 certified by SGS since 2005.
A2: We have various rubber compounds approved by UL, FDA, NSF, KTW, W270, WRAS, ACS, AS4020, EN681, EN549, ROHS and REACH.