JSW Steel plans to complete construction of its new plants -5 million tonne (MT) in Dolvi, Maharashtra and 1 MT in Vijayanagar, Karnataka, which was delayed due to shortage of workers during the lockdown, in the first half of 2022. the company's joint managing director and aroup chief financial officer Seshagiri Rao said.ISW Steel is targeting to achieve 29 MT production capacity with the completion of the greenfield capacities and acquisition of Bhushan Power and Steel (RPSI)The company had offered about Rs 19,700 crore for the acquisition of BPSL, but the matter is before the Supreme Court as the Enforcement Directorate (ED) wanted to attach the assets of bankrupt firm in an alleoed money laundering case against the old managementThe steelmaker is also planning to complete the downstream capacity expansion to 11 MT from 5 MT along with the Dolvi and Viavanaoar capacity construction. The company has 12 MT and 5 MT capacity in Viavanagar and Dolvi, respectively It also has a 1 MT plant in Salem"We are also continuing captive iron ore integration with the steel plants as it will reduce costs of production. The other cost reduction projects like pallet plant, coke oven batteries. power plants will be commissioned in this year," said RaoJSW Steel will commence brown field expansion of JSW Isoat and BPSL once these proiects are completed. Ispat which JSW acauired through bankruptcy proceedings, has turned around with net profit of Rs 29 crore in third quarter. With the completion of acquisition of BPSL. JSW will have 28-29 MT capacity in India, said Rao.
Product Description
Product Name: | Large diameter spiral welded steel pipe seamless pipe LSAW pipe | |
Size: | OD | 219-3220mm |
Wall Thickness | 4-22mm SCH30,SCH40,STD,XS,SCH80,SCH160,XXS etc. | |
Length | 1-12m | |
Steel material | Q195 → Grade B, SS330,SPHC, S185 Q215 → Grade C,CS Type B,SS330, SPHC Q235 → Grade D,SS400,S235JR,S235JO,S235J2 | |
Standard | JIS A5525, DIN 10208, ASTM A252, GB9711.1-1997 | |
Usage | USed For Structure, Accessorize And Construction | |
Ends | Beveled | |
End protector | 1) Plastic pipe cap 2)Iron protector | |
Surface Treatment | 1) Bared 2) Black Painted (varnish coating) 3) With Oiled 4) 3 PE, FBE | |
Technique | Electronic Resistance Welded (ERW ) Electronic Fusion Welded (EFW) Double Submerged Arc Welded (DSAW) | |
Type | WELDED | |
Welded Line Type | Spiral | |
Section Shape | Round | |
Inspection | With Hydraulic Testing, Eddy Current , Infrared Test | |
Package | 1) Bundle, 2) In Bulk, 3) Bags, 4) Clients' Requirements | |
Delivery | 1) Container 2) Bulk carrier |
Wuxi Mingshang Special Steel Co., Ltd is located in the one of three steel business areas, Wuxi city Jiangsu province,has the most convenient transportation,near to Shanghai.Our company has own large-scale indoor warehouse with perennial spot stocks above 40000 tons.
The main products of our company include:
1.Steel Round Bar:cold drawn,hot rolled
2.Steel Round Pipe:Seamless pipe,ERW Pipe
3.Steel Square/Rectangular Pipe:Seamless or Welded
4.Steel profiles including H beam,I beam,angle steel,channel steel,flat bars etc
5.Galvanization series,including galvanized angle steel,galvanized channel steel,galvanized flat steel,galvanized round steel,galvanized square pipe,galvanized round pipe etc
1, what is your time of making a sample
Usually we will take 1~3 days to make the sample
2,What is your delivery time?
For stocks, we can send the goods to loading port within 7 days after receiving your deposit
For production period, it usually needs about 15-30 days after receiving the deposit
3, What is your shipping port?
Shanghai port, Ningbo port, Tianjin Port
4, What is your payment terms?
Usually 30% deposit by TT in advance and balance against copy of BL or LC at sight
5,What is your company locations?
Our office is located in Wuxi City Jiangsu province.
We have two indoor warehouses to ensure enough stock for different materials with sizes