India Extends Nationwide Lockdown Until Jun 30

- May 31, 2020-


The Ministry of Home Affairs of India announced on May 30 that it would extend the ongoing nationwide lockdown for another month, until June 30.The Ministry issued an order that night, saying that India would enter the next phase of nationwide lockdown from June 1 to June 30, during which international commercial flights will not be resumed temporarily, and a curfew will be imposed nationwide from 9:00 p.m, to 5:00 pm, every night.n an effort to contain the spread of the epidemic, India mposed a nationwide lockdown that began on March 25 and was extended three times until May 31.


Product Description
Descriptions
Grades
Structural pipe
20# 35# 45# Q345B, 16Mn, Q345B-E, 20Mn2, 25Mn, 30Mn2, 40Mn2, 45Mn2

SAE1018, SAE1020, SAE1518, SAE1045.
Liquid pipe
20# q295b-e, q345b-e
High pressure boiler tube
20G 15MnG 20MnG 15CrMoG, 12Cr1MoVG
St35.8, sa106b, sa106c, sa210a, sa210c, A333P2, A333P11, A33P12, A333P22, A33P36, A333P91, A333P92, A335T2, A335T11, A335T12, A335T22, A335T91, A335T23, A335T9
Pipeline 
API SPEC 5L, X42, X52, X60, X65,X70,X80
ASTMA53, ASTM A106, ASTM A333, BS301, BS3602, BS3603, BS3604, PSL1, PSL2, DNV-OS-F101, CSA-Z245
Alloy pipe
4140, 42CrMo, 32CrMo, 15CrMo,
Packing
Black paint, Varnish painting, Tarpaulin packing
End
Common round end, beveled.
Processing
Galvanizing; cutting; making thread outside the pipe; Machining.
Detailed Images

Hot rolled steel pipe

 using hot rolled steel pipe billet to make heating and piercing, elongating, sizing and stranghtening, cooling, finally hollow bars finished, this is the type most commonly used. Because it is hot rolled, so cost is lowest, but it is suit for large quantity, for small quantity, have to make cold drawn or round bar piercing. size: outer diameter 32mm- 499mm, wall thickness 4mm- 80mm

Material
ST37,ST52, 20#. 1020, SAE1518, Q345B 20G, 45CrMo, 30CrMo etc.
Dimension
Out Diameter:10-600mm
Thickness: 1mm-200mm.
Length: 1m - 12m
Delivery time
stock size 5-10 days, special size 15-25 days.
Payment term
30% TT or LC at sight
Packing & Delivery

Packing

1. by bundles, each bundle weight under 3 tons, for small outer diameter seamless steel pipe, each bundle with 4 - 8 steel strips.

2. after making by bundle, covered with Polyethylene waterproof cloth.

3. make black paints painting on each pipe, then make bundles


Our Service

we can cut the seamless steel pipe into the length you demand, and can make the surface to be bright by milling and grinding at the Lathe, and can grind the outer diameter and wall thickness to be the dimension you demand.If the sizes are not available from the standard common stock sizes, and the quantity are not enough for the new production, then we need process the stock larger seamless pipes into the sizes you need. And we also can make steel pipes deep processing. For example, size OD250x ID200 is not stock common size, then need using larger pipe to process into 250x 200, same as OD170xID100

Other products
About us


Cangzhou Steel Pipe Group (CSPG)Co.,Ltd.

No.92 JieFang East Road ,Cangzhou City, Hebei,P.R.China.

CSPG  has more than eighteen years history company which located in Lecong Iron and Steel World, a well-known steel distribution center in China, with superior geographical position and convenient water and land transportation. 


We are a direct-selling manufacturer specializing in the research and development of spiral steel pipes, steel spiral pipes, anti-corrosion steel pipes inside and outside. Since its inception, the company has been guided by a brand-new thinking of steel pipe product market based on the business philosophy of honesty, pragmatism and knowledge-seeking.

FAQ

1.How long can make delivery?

For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.

2. Will the Test Certificate be certified to EN10204 3.1?

For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.

3. Once the received products found not comply with the products the contract demands, what will you do?

Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.