Evraz Records Lower Steel Product Sales In Q3

- Oct 30, 2020-

Evraz PLC said on Thursday said that total steel product sales fell in the third quarter compared with the prior three-month period with a fall in the sales of semi-finished products offsetting a rise in finished productsThe London-based steel-makino and mining company. which mainly operates in Russia. said that thirduarter crude steel production slipped to 3.2 million metric tons from 3.4 million tons in the second auarter.The company said this was mainly due to the planned shutdown of blast furnace number five and the launch of blast furnace number six afer the completion of a maior overhaulTotal sales of steel nroduct fell 9 5% over the quarter to 3 1 million tons london-listed Fvraz saicCrude steel production fell in the first nine months of the vear to 10.2 million tons. from 10.4 million tons in the first nine months of 2019.The metals producer said production of raw cokina coal rose 14 6% to 4 8 million tons. driven by the completion of longwall moves at the Alardinskava and Esaulskava mines.Vanadium sales rose 13.4% over the auarter to 2.8 million tons. on the back of increased steel utilization rates.and a slight recovery in the automotive industr


Product Description
Product Name
welded steel pipe
Material/Grade
1010,1026, X42, X46, X52, X56, X60, X70,ASTM A106B, ST52, ST37,ST45,ST45..
Standard
API, ASTM A530, ASTM A519, ASTM A53,  GB 3087, GB/T8163, GB 5130, GB/T 8162, 
Outer diameter
20mm-1020mm
Wall thickness
3mm-30mm
Length
1-12m, Fixed length, random length or as required
Test
Chemical Component Analysis, Mechanical Properties, Technical Properties, Exterior Size, Nondestructive Testing
Advantages
Competitive price, Quality assurance, Short delivery time, Superior Service, Minimum quantity is small
Products Show
Product Process
Packing & Delivery

Packing Details  : in hexagonal sea-worthy bundles using steel straps and cotton slings,

                                     with antirust oil/paint,marking and plastic protecting caps

Delivery Details  : 20-60days after order of seamless steel pipes







Our Company

Factory

Workshop


Cangzhou Steel Pipe Group (CSPG)Co.,Ltd.

No.92 JieFang East Road ,Cangzhou City, Hebei,P.R.China.

CSPG  has more than eighteen years history company which located in Lecong Iron and Steel World, a well-known steel distribution center in China, with superior geographical position and convenient water and land transportation. 


We are a direct-selling manufacturer specializing in the research and development of spiral steel pipes, steel spiral pipes, anti-corrosion steel pipes inside and outside. Since its inception, the company has been guided by a brand-new thinking of steel pipe product market based on the business philosophy of honesty, pragmatism and knowledge-seeking.

Warehouse

Team

Our Certifications
Customer Photo
FAQ

1.Q: How long is your delivery time ? 

A: Generally it is 5-15 days if the goods are in stock. Or it is 25-60 days if the goods are not in stock, the specific delivery time depends on the items and the quantity of your order.

2.Q: Do you test all your goods before delivery?

A: Yes, we have 100% test and NDT before delivery.

3.Q: What is your terms of payment ?

A: 30% T/T in advance ,balance before shippment. 100% L/C at sight.