EU To Implement Final Safeguards To Curb Imports Of Steel Products

- Apr 17, 2019-

The EU upgraded its trade remedies on February 1 and decided to implement final safequards to curb imports of 26 categories of steel products.According to the notice issued by the European Commission on February 1, it would impose final safequards to curb imports of steel products via tariff-rate quota from February 2. The EU will lewy 25% of safequarc tariffs if the amount of imported steel products exceeds the quotaAs one of trade remedies of the WTO. safequard measures have two kinds: provisional safequard measures and final safequard measures. These measures are taken to avoid the sharp increase in imports of a certain product which may seriously injure or endanger related industries of importing countries.The U.S. levied additional tariffs of 25% on imported steel products from March 23, 2018, and the EU initiated a safeguard measure investigation on imported steel products on March 26. 2018. The EU imposed provisional safequards to restrict imports of 23 categories of steel products from July 19. 2018.The EU said that the U.S. imposed restrictions on own steel market, so steel products flew into the EU whose imports of steel products moved up notably. The sharp rise in imports of steel products in the EU market seriously endangered the EU's steel producers, so the EU replaced provisional safequards with final safeguards.The final safeguards which were imposed from February 2 would be valid for three years during which the review can be conducted pursuant to actual situationIn addition, the EU also adopted another two measures to deal with the additional tariffs imposed by the U.S.on steel products. The EU levied retaliatory tariffs on imports of commodities of the U.S. and resorted to the WTO to solve the dispute.

Product Description
Product Name
welded steel pipe
Material/Grade
1010,1026, X42, X46, X52, X56, X60, X70,ASTM A106B, ST52, ST37,ST45,ST45..
Standard
API, ASTM A530, ASTM A519, ASTM A53,  GB 3087, GB/T8163, GB 5130, GB/T 8162, 
Outer diameter
20mm-1020mm
Wall thickness
3mm-30mm
Length
1-12m, Fixed length, random length or as required
Test
Chemical Component Analysis, Mechanical Properties, Technical Properties, Exterior Size, Nondestructive Testing
Advantages
Competitive price, Quality assurance, Short delivery time, Superior Service, Minimum quantity is small
Products Show
Product Process
Packing & Delivery

Packing Details  : in hexagonal sea-worthy bundles using steel straps and cotton slings,

                                     with antirust oil/paint,marking and plastic protecting caps

Delivery Details  : 20-60days after order of seamless steel pipes







Our Company

Factory

Workshop

Cangzhou Steel Pipe Group (CSPG) Co., Ltd. is a large-sized, key metallurgic enterprise of Hebei Province in North China, whose history dates back to 1994. CSPG currently em/paces six member companies with products varying from SSAW, LSAW, ERW, seamless steel pipes to 3PE pipes, galvanized pipes, casing pipes, etc. A Joint-stock corporation, CSPG occupies an area of 600,000 square meters with a total asset of $530 million.



Specialized in the production of straight welded pipe spiral pipe galvanized pipe 3PE/3PP/FBE/TPEP internal and external epoxy powder internal and external epoxy resin cement mortar two cloth three oil buried pipeline IPN8710 non-toxic drinking water internal and external plastic coated lining plastic and other anti-corrosion pipe fittings for oil and gas pipeline water conservancy projects



Executive standard :DIN30670 DIN30678 CSA Z245 AFNOR nf49-710/711 NACE rp0394/0490 AWWAC 210/C213GB/T9711 API 5L ISO 3183Material: Q235B/Q355BGR A GR B x42-x80 l245-l555

 

Business scope: 21.3mm-3620mmLSAW submerged arc welded pipe 325-2020mmERW straight welded pipe 6mm-711mmSMLS seamless tube 10-1120mmSSAW spiral steel tube 219-3620mmDemand for quality suppliers and partners


Warehouse

Team

Our Certifications
Customer Photo
FAQ

1.Q: How long is your delivery time ? 

A: Generally it is 5-15 days if the goods are in stock. Or it is 25-60 days if the goods are not in stock, the specific delivery time depends on the items and the quantity of your order.

2.Q: Do you test all your goods before delivery?

A: Yes, we have 100% test and NDT before delivery.

3.Q: What is your terms of payment ?

A: 30% T/T in advance ,balance before shippment. 100% L/C at sight.