Crude Steel Production In Germany Falls By 27% YOY In May

- Jun 25, 2020-

Crude steel production in Germany fell by 27 percent to 2.6 million tons in May compared to the same month last vear. the German Steel Federation (WV Stahl) announced on Wednesday.In April, crude steel production in Germany had already dropped by 24 percent and WV Stahl warned that "demand for steel could shrink to an even lower level than durina the 2009 financial crisisThe CovD-19 crisis would "hit the industry at a time when it was already weakened by the economic downturn" in important customer industries WV Stahl statedGermany's largest steel producer ThyssenKrupp announced in May that the first half of the current fisc al year was "sianificantly impacted by the initial effects of the coronavirus pandemic."Total volumes on the steel market in Germany had fallen by 12 percent last year. Crude steel production dropped for the second year in a row and. for the first time since 2009. fell below the 40-million-ton mark at39.7 million tons.


Product Description
Material
Q195, Q235, Q345; ASTM A53 GrA,GrB; STKM11,ST37,ST52, 16Mn,etc.
Wall Thickness
0.7MM~30MM
Length
Length:Single random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual reques
Standard
JIS G3466, EN 10219, GB/T 3094-2000, GB/T 6728-2002
Grade
Grade A, Grade B, Grade C
Section Shape
Square, Rectangular, Round,
Technique
Spiral Steel Pipe
Packing
Bundle, or with all kinds of colors PVC or as your requirements
Ends
Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.
MOQ
1 Tons, more quantity price will be lower
Surface Treatment
1. Galvanized
2. PVC,Black and color painting
3. Transparent oil,anti-rust oil
4. According to clients requirement
Product Application:
1. Fence, greenhouse, door pipe,greenhouse
2. Low pressure liquid, water, gas, oil, line pipe
3. For both indoor and outdoor the building construction
4. Widely used in scaffolding construction which is much cheaper and convenient
Origin
Shandong OF China
Certificates
API ISO9001-2008,SGS.BV
Delivery Time
Usually within 10-45 days after receipt of advance payment
Packing&Delivery

1).20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High)

    20 Feet Container:Load about 26 tons steel pipe, length under 5.8 meter.

2).40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High)

    40 Feet Container: Load about 26 tons steel pipe, length under 11.8 meter.

3).40ft HC:12032mm(Lengh)x2352mm(Width)x2698mm(High)

    Bulk Vessel: Special length over 12meter, big quantity products, sea freight is cheap.

4) Lead Time: within 10-25 workdays normally
5) Packing: Standard seaworthy packing or as per your request .(as pictures)

Production Process
Our certification

Our company has established good relations with other domestic steel mills, like wusteel, baosteel, ansteel, and  also have cooperation with foreign steel mill, We have our own quality management systems, strictly control purchases, produce, sales, warehouse and transport processes.

Customer Visit

Our high quality materials and products are widely used in construction equipment, handling equipment,  coal mining, power plant, cement plant, construction machinery, steel construction, container, ship, iron art etc.

Our products have been highly praised by our clients from Europe, America, the Middle East, African and Southeast Asia. We will offer competitive products and comprehensive service to customers.