According to data released by China lron & Steel Association (CISA), Chinese major steel mills produced 22.1523 million tons of steel products in late September 2020. The average daily output was 2.2152 million tons during the period, up by 8.31% MOM and 14.37% YoY.During the reported period, major steel mills held the steel products inventory of 11.5961 million tons, down by 18087 million tons or 13.49% from mid-September while up by 2 0637 million tons or 21.65% from early this year
Product Name: | Large diameter spiral welded steel pipe seamless pipe LSAW pipe | |
Size: | OD | 219-3220mm |
Wall Thickness | 4-22mm SCH30,SCH40,STD,XS,SCH80,SCH160,XXS etc. | |
Length | 1-12m | |
Steel material | Q195 → Grade B, SS330,SPHC, S185 Q215 → Grade C,CS Type B,SS330, SPHC Q235 → Grade D,SS400,S235JR,S235JO,S235J2 | |
Standard | JIS A5525, DIN 10208, ASTM A252, GB9711.1-1997 | |
Usage | USed For Structure, Accessorize And Construction | |
Ends | Beveled | |
End protector | 1) Plastic pipe cap 2)Iron protector | |
Surface Treatment | 1) Bared 2) Black Painted (varnish coating) 3) With Oiled 4) 3 PE, FBE | |
Technique | Electronic Resistance Welded (ERW ) Electronic Fusion Welded (EFW) Double Submerged Arc Welded (DSAW) | |
Type | WELDED | |
Welded Line Type | Spiral | |
Section Shape | Round | |
Inspection | With Hydraulic Testing, Eddy Current , Infrared Test | |
Package | 1) Bundle, 2) In Bulk, 3) Bags, 4) Clients' Requirements | |
Delivery | 1) Container 2) Bulk carrier |
Cangzhou Steel Pipe Group (CSPG)Co.,Ltd.
No.92 JieFang East Road ,Cangzhou City, Hebei,P.R.China.
CSPG has more than eighteen years history company which located in Lecong Iron and Steel World, a well-known steel distribution center in China, with superior geographical position and convenient water and land transportation.
We are a direct-selling manufacturer specializing in the research and development of spiral steel pipes, steel spiral pipes, anti-corrosion steel pipes inside and outside. Since its inception, the company has been guided by a brand-new thinking of steel pipe product market based on the business philosophy of honesty, pragmatism and knowledge-seeking.
1, what is your time of making a sample
Usually we will take 1~3 days to make the sample
2,What is your delivery time?
For stocks, we can send the goods to loading port within 7 days after receiving your deposit
For production period, it usually needs about 15-30 days after receiving the deposit
3, What is your shipping port?
Shanghai port, Ningbo port, Tianjin Port
4, What is your payment terms?
Usually 30% deposit by TT in advance and balance against copy of BL or LC at sight
5,What is your company locations?
Our office is located in Wuxi City Jiangsu province.
We have two indoor warehouses to ensure enough stock for different materials with sizes