CISA: Major steel mills' average daily output of crude steel records 2.11 million tons in late Noy
According to the data released by China lron & Steel Association (CISA), major Chinese steel mills totally produced about 21.06 million tons of crude steel in late November 2020. The average daily output of crude steel was about 2.11 million tons in late November, down by about 0.36% MOM while up by about 7.18% YoY.
Steel Pipe Type | Q235 Carbon round welded galvanized steel pipe |
Outside Dia(mm) | 10.3-1219mm |
Wall Thickness(mm) | 1.5-30mm |
Length | Random length:5-12m |
Standard | API5L , ASTM A106 Gr.B, ASTM A53 Gr.B, ASTMA179/A192/A213/A210/370WP91,WP11,WP22 GB5310-2009,GB3087-2008,GB6479-2013,GB9948-2013, GB/T8163-2008, GB8162-2008,GB/T17396-2009 |
Material | 20#, A53B, A106B, API 5L ST37.0,ST35.8,St37.2,St35.4/8,St42,St45,St52,St52.4 STP G38,STP G42,STPT42,STB42,STS42,STPT49,STS49
|
Surface | Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE,ect |
Certificates | API5L ISO 9001:2008 TUV SGS BV etc |
Packaging | Loose package, Packaged in bundles(3Ton Max) , bundled pipes with two slings at the both end for easy loading and discharging, End with Plastic caps or as per requirement |
Application | 1. Fluid pipe 2. Power Plant 3. Structure pipe 5. Seamless pipe /tube for petroleum cracking 6. Conduit pipe 7. Scaffolding pipe pharmaceutical andship,building etc.
|
Cangzhou Steel Pipe Group (CSPG)Co.,Ltd.
No.92 JieFang East Road ,Cangzhou City, Hebei,P.R.China.
With the sense of responsibility, customer-centered, market-oriented, service-oriented, spot supply as the main body, good reputation, excellent business quality, integrity, conscientious work, perception of society and the spirit of Bianjin, we are committed to creating a win-win, easy and convenient large-scale integrated steel procurement for customers Platform.
The company upholds the enterprise tenet of integrity-based and customer-oriented, constantly strengthens internal management and builds an elite team, and will: all for users throughout the whole process of economic management, for this purpose, to provide customers with high-quality products and excellent services.
1, what is your time of making a sample
Usually we will take 1~3 days to make the sample
2,What is your delivery time?
For stocks, we can send the goods to loading port within 7 days after receiving your deposit
For production period, it usually needs about 15-30 days after receiving the deposit
3, What is your shipping port?
Shanghai port, Ningbo port, Tianjin Port
4, What is your payment terms?
Usually 30% deposit by TT in advance and balance against copy of BL or LC at sight
5,What is your company locations?
Our office is located in Cangzhou City Hebei province.
We have two indoor warehouses to ensure enough stock for different materials with sizes