China's Steel Product Imports Up By 26% YOY In H1 2020

- Jul 13, 2020-

According to the latest statistics released by the General Administration of Customs of China, in June 20220 China imported 1.878 million tons of steel products, up by 46.7% MOM and by 99.8% YOY.From Januarv to June 2020, China imported a total of 7.343 million tons of steell products, up by 1.52 million tons or 26.1% YOY.                    


Product Description
Product Name
Spirally Submerged Arc Welding Pipe
Outer Diameter (OD)
219mm - 3600mm
Wall Thickness (WT)
5mm - 26mm
Length (L)
5800mm - 12300mm
Standard
API Spec 5L PSL1/PSL2, ASTM A53, ASTM A252, GB/T9711.1, GB/T 9711.2, GB/T 3091, EN10217, AWWAC200
Material
 Q235A, Q235B, Q345B, #10, #20, 16Mn, L245, L290, L360, X42, X46, X52, X56, X60, X65, X70, ect
Package
 In bundles, Painting, Beveled edges, plastic caps ends, or as buyer's request.
Used
The pipes are widely used in natural gas, offshore oil piling, petroleum, chemical industry, electric power, heat, water supply adn drainage, steam heating, pressure steel pipe for hydropower stations, thermal power generation, water adn other long-distance transmission pipelines and piling, Bridges, steel structures and other engineering fields. 
Products Show
Specification
Process
Workshop
Our Certifications
Customer Photos
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 30-45 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: 30% T/T in advance ,balance before shippment, or L/C at sight balance of copy of B/L