What should you pay attention to when producing spiral steel pipes in summer?

- Nov 16, 2020-

     The finished spiral steel pipe is discharged after water cooling, but after all, after high temperature heating, the temperature of the spiral steel pipe is still quite high after water cooling, so the following points should be noted after the spiral pipe is taken off the summer :
     The finished spiral steel pipe is discharged after water cooling, but after all, after high temperature heating, the temperature of the spiral steel pipe is still quite high after water cooling, so the following points should be noted after the spiral pipe is taken off the summer :


     One: In the production process of spiral steel pipe, the epoxy powder and the adhesive should be 1% larger than usual , so as to achieve the actual required thickness.


     Second: Do not expose to high temperature after the spiral steel pipe is taken off the line. Exposure can easily lead to the expansion of the PE layer and thus the outer wall of the steel pipe, which will not achieve the anti-corrosion effect.


     Three: Do not be exposed to rain after the spiral steel pipe is taken off the line. It is easy to cause water seepage at the pipe joint after rain.


     Four: After the spiral steel pipe is taken off the line, it should be placed in a flat place, and it should be placed flat. Do not squeeze each other. If the extrusion type is placed at least 24 hours, the PE layer should be completely attached to the outer wall of the steel pipe. .


     3PE anti-corrosion structure:


     Ordinary grade ≥ 0.70 one layer of primer + one layer of inner layer + one layer of outer belt


Reinforced grade ≥ 1.40 layer of primer + inner layer (overlap is 50~55% of tape width )


One layer of outer tape (overlap is 50~55% of tape width )


It is mainly used for oil and natural gas transmission; the outer surface of buried steel pipelines such as water supply and drainage and gas transportation in chemical and urban construction is anti-corrosion, which has the characteristics of convenient construction and no pollution. Polyethylene PE anti-corrosion adhesive tape has been widely used as an outer anti-corrosion material on oil and gas steel pipelines since the 1960s . It has been used for more than 40 years. Due to its excellent anti-corrosion performance and convenient construction performance, it has made it an anti-corrosion material for pipelines. The system has a certain position. And since the polyethylene coating tape production enterprises continuously improve and enhance polyethylene PE variety and quality of anti-corrosion adhesive tape, so that the polyethylene PE applications anticorrosion adhesive tape expanding.


Product Description

API 5L  steel pipe with 3LPE coating for external and FBE coating internal

Product Name
API 5L steel pipe with 3LPE coating for external and FBE coating internal
Material
Carbon Steel 
Surface
3LPE COATED
Standard
API 5L
Grade
Gr.B, X42, X56,X60,X70,X80.
Thread
As customer's requirement
Used
Oil and gas delivery.
Products Show
Our Company

Factory

Our Factory

Workshop

Our Workshop

Warehouse

Our Warehouse

Team

Our Team


Our Certifications

Best Carbon steel

Customer Photo

                                                              2018                                                  Dusseldorf 

Tube exhibition                                    Germany 







2017 Guangzhou Canton Fair China                                              2016 Shanghai  Tube Exhibition                                              China



FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 30 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.