How to stack large diameter steel pipes

- Nov 17, 2020-

When stacking galvanized steel pipes, we must do a reasonable stacking and advanced first-hand 


(1) stacking code. The principle is to ensure that the pallets are stable and safe, and that the materials of different varieties are coded according to the varieties and specifications. It should be separately coded to prevent confusion and mutual corrosion. 


(2) It is forbidden to store items that are corrosive to steel pipes near the squatting position. 


(3) The bottom of the shovel should be raised, sturdy and flat to prevent moisture or deformation 


of the material. (4) The same material According to the warehousing, they are stacked separately to facilitate the implementation of the principle of advanced first-generation. 


(5) The steel can be stacked in the open air. There must be wooden mats or strips underneath. The sloping surface is slightly inclined to facilitate drainage. Pay attention to the flatness of the materials. Cause bending deformation (6) stacking height, manual operation does not exceed 1.2m, mechanical operation does not exceed 1.5m, and 垛 width does not exceed 2.5m 


(7) There should be a certain passage between  and , inspection road - generally O.5m, depending on the material size and transportation machinery, - generally 1.5~2. Om 


(8)  bottom pad high, if the warehouse is a sunny cement floor, the height of O.1m can be; If it is muddy, it must be 0.2~0.5m high. If it is open space, the concrete floor height is 0-3~O.5m, and the sand surface is 0.5~0.7m. 


9) Open-pit angle and The channel steel should be placed down, that is, the mouth should face down, the I-beam should be placed vertically, and the I-groove surface of the steel pipe should not face upwards to avoid rusting of water.



Product Description
Product Name
welded steel pipe
Material/Grade
1010,1026, X42, X46, X52, X56, X60, X70,ASTM A106B, ST52, ST37,ST45,ST45..
Standard
API, ASTM A530, ASTM A519, ASTM A53,  GB 3087, GB/T8163, GB 5130, GB/T 8162, 
Outer diameter
20mm-1020mm
Wall thickness
3mm-30mm
Length
1-12m, Fixed length, random length or as required
Test
Chemical Component Analysis, Mechanical Properties, Technical Properties, Exterior Size, Nondestructive Testing
Advantages
Competitive price, Quality assurance, Short delivery time, Superior Service, Minimum quantity is small
Products Show
Product Process
Packing & Delivery

Packing Details  : in hexagonal sea-worthy bundles using steel straps and cotton slings,

                                     with antirust oil/paint,marking and plastic protecting caps

Delivery Details  : 20-60days after order of seamless steel pipes







Our Company

Factory

Workshop

Cangzhou Steel Pipe Group (CSPG)Co.,Ltd.

No.92 JieFang East Road ,Cangzhou City, Hebei,P.R.China.

CSPG  has more than eighteen years history company which located in Lecong Iron and Steel World, a well-known steel distribution center in China, with superior geographical position and convenient water and land transportation. 


We are a direct-selling manufacturer specializing in the research and development of spiral steel pipes, steel spiral pipes, anti-corrosion steel pipes inside and outside. Since its inception, the company has been guided by a brand-new thinking of steel pipe product market based on the business philosophy of honesty, pragmatism and knowledge-seeking.


Warehouse

Team

Our Certifications
Customer Photo
FAQ

1.Q: How long is your delivery time ? 

A: Generally it is 5-15 days if the goods are in stock. Or it is 25-60 days if the goods are not in stock, the specific delivery time depends on the items and the quantity of your order.

2.Q: Do you test all your goods before delivery?

A: Yes, we have 100% test and NDT before delivery.

3.Q: What is your terms of payment ?

A: 30% T/T in advance ,balance before shippment. 100% L/C at sight.