Abrasion resistant pipe
The wear-resistant pipeline system is widely used in coal-fired power plants for various purposes, including transporting coal slurry to a nearby sedimentation tank, transferring limestone slurry to a absorber spray tower to remove sulphur dioxide (SO2) and hydrogen from flue gas (HCl) and calcium sulphate byproducts for the flue gas desulfurization process.
After analysis and research, it is considered that the main factors affecting the failure of drill stem wear ring are the abrasiveness of the stratum, the choice of high abrasive and the technology of volatilization.



ASTM A511,ASTM A778 ,ASTM A312,ASTM A358,ASTM A409,ASTM A213,ASTM A790,ASTM A268,ASTM A269,ASTM A554,ASTM B338,ASTM B673,ASTM
B674,ASTM B677,ASTM B675, ASTM B676, ASTM B690,ASTM A928,ASME B36.19,ASMEB36.10,ASTMA179/A192/A213/A210/370WP91,WP11,WP2
GB5310-2009,GB3087-2008,GB6479-2013,GB9948-2013,GB/T8163-2008, GB8162-2008,GB/T17396-2009EN10216-5,EN10217-7,DIN 17456,DIN 17458
JIS G3463,JIS G3119,JIS G3446,JIS G3218,JIS G3258,JIS G3448,JIS H4631DEP 31,DEP 40,DEP 20,DEP 32,DNV-OS-F101GradeQ195 = S195 / A53
Grade AQ235 = S235 / A53 Grade B / A500 Grade A / STK400 / SS400 / ST42.2Q345 = S355JR / A500 Grade B Grade COuter DiameterERW /
HFWLSAW / DSAWSSAW / HSAWRHSSHS1/8 - 20 inch12 - 56 inch8 - 126 inch40 x 20 mm15 x 15 mm(10.3-508 mm)(323.8-1,420 mm)(219.1-3,200
mm)-1,000 x 800 mm-1,000× 1,000 mmWall Thickness0.4 - 16 mm6.0 - 40 mm6.0 - 26 mm1.0 - 30 mm0.6 - 30 mmLength5.8~12.0 m or as
customizedSurface TreatmentPrime quality (bared, oiled, color paint, 3LPE, or other anti-corrosive treatment)InspectionWith
Chemical Composition and Mechanical Properties Analysis;Dimensional and Visual Inspection, also with Nondestructive Inspection.
ApplicationStructure, Electric power transmission tower projects, Piling, Water, Oil & gas pipeline engineering, Mechanical
industry, Municipal projects, Roads and its auxiliary facilities, etc.
Packing& Shipping
![]() | ![]() |
Delivery time
100KG | 7 days after payment |
1000 KG | 15 days after payment |
5000 KG | 25 days after payment |
>10000 KG | 35-40 days after payment |