Product Details
Polyethylene protective 3 layer structure is also called the 3 PE/pp.it was a advanced external anti-corrosion technology introduced from Canada to China's in 1995 .3 PE coating, epoxy coating interface properties and chemical properties, and the advantages of extruded polyethylene anti-corrosive coating mechanical protection feature, so as to significantly improve their performance.
Brief Introduction
DIN 30670 3PE Coated Carbon Steel Pipe
COATED SEAMLESS/WELDED PIPE:
1.SIze:OD: 1/2" to 36" W.T:2MM TO 60MM
Length:SRL,DRL,5.8M,6M,12M
2. Standard&Grade:
API 5L GR.B, X 42, X 46, X 52, X 60
ASTM A 53 GR.A/GR.B ,ASTM A333 GR.3 / GR.6 / ASTM A519/A517/542
EN 10210 / EN10219 /EN10297/EN10216,S275, S355,S355J0H,ST37,ST52
DIN,JIS ,GOST
3. Certification: API 5L,CE,ISO9001, SGS
4. Coating type:
Galvanized coating
3LPE as per DIN30670
2PE/3PE/2PP/3PP/FEB/Epoxy/High density polyethylene
Product Name | 6" Seamless coating pipe 3 LPE coated as per DIN 30670 |
Material | Carbon steel and Aolly |
Color | Black varnished or coating color |
Standard | API 5L,ASTM,EN,DIN ,BS,GOST |
Surface | Bare ,Black varnised,3PE,FBE,Epoxy |
Brade | CZ |
End | Bevelled ends ,plain ends |
Used | The contruction,pipeline for Oil,gas,water,steam,Fluids |
Other products | Seamless steel pipe |
3 Layer Polyethylene Anti-Corrosion Coating Production Process
3 Layer Polyethylene Anti-Corrosion Coating Production Process
Polyethylene protective 3 layer structure is also called the 3 PE/pp.it was a advanced external anti-corrosion technology introduced from Canada to China's in 1995 .3 PE coating, epoxy coating interface properties and chemical properties, and the advantages of extruded polyethylene anti-corrosive coating mechanical protection feature, so as to significantly improve their performance.
According to the experiment, 3 PE can extend the life of buried pipelines for 50 years .The anti-corrosive coatings are widely used in the oil and gas transmission pipeline.Now the domestic existed hundreds of 3 PE coating production line, has the processing Φ 25-2800 - mm steel pipe of 3 PE coating capability.The coating is in accordance with DIN 30670, 30678, TS 5139,UNI 9099 and EN 10288 standards.
First Layer : Electro statically applied fusion bonded epoxy primer(FBE>100um)
Second Layer : Extruded adhesive wrapping(AD170~250um)
Third Layer : Extruded polyethylene wrapping Coating(PE2.5~3.7mm)
Certifications of product
The Workshop
Product Applications
FAQ
Why to choose us?
1.We provide products to our customers individual specifications and special needs with competitive price and best service.
2. Immediate respond
We will be 24/7 on line at your services. Provide one-to-one service with our sincerity.
3. Professional suggestions
We could provide you the professional suggestion with our expertise acumen.
4. Short delivery period
We are based on a long-term cooperation with several major domestic steel company with an outstanding advantage is sufficient supply. Shorter the supplying period.
Edit by Ms. Vicky of CSPG
Contact us directly by:
Email: ella@cnspipe.com ,vicky@cnspipe.net
Tel / Whatsapp: +86-180327140146
Skype: cnspipe002